• Cut out long support beam and short support beam
  • Drill holes where indicated large enough for dowel to pass through and rotate freely
  • Score and bend on dotted lines. Lines marked like this <INSERT IMAGE HERE> should be scored on the reverse
  • Fold long support beam and glue to base as shown, passing a piece of dowelling thorugh the holes in the beam and the bse to ensure accurate alignment. Fold short support beam and glue to long beam and base as shown, using the dowel to keep the holes aligned.
  • Cut out spacer. Score and bend on dotted lines. Then fold into an open box shape and glue tab in place. Glue spacer to top of short support beam, open end up as shown.
  • Cut out one of the four washers. Drill hole in center large enough for dowel to fit through snugly. Glue the washer onto the spacer using dowel to keep holes aligned.
  • Cut out ramp sections. Glue in place on base and over ends of long support beams as shown. Be sure that the ends of the ramp sections meet. There should be no gap left between them.